Baton Rouge, LA

IDEA 3 – Plank Road

New School Facility Partners Grace Hebert Curtis Architects, APAC 75,000 SF
Completion Date

January 2022

Two-story building consisting of a total of 75,000 SF. It includes two floors of academic area consisting of approximately 26,000 SF at each floor. The remaining 23,000 SF was split between a single-story gym and cafeteria with a full kitchen. The exterior facade consists of Hardie siding and metal panels. The site is a 21.12-acre site.

Let’s build something special